Ni-Co Energy Reports 4.60 Metres at 0.59% Nickel at Kremer-2; Phase-One Drilling Advances Magmatic Sulphide Exploration Model
Assay-confirmed shallow mineralization | Sulphide-bearing mafic rocks at depth | Spring 2027 drilling planned GATINEAU, QUÉBEC – November 19, 2026 – Ni-Co Energy Inc. (TSXV: NICE) ("Ni-Co" or the "Company") reports results from the initial phase of its 2026 diamond drilling campaign at its 1...
